Identification of applicable requirements
Our AI system automatically identifies and extracts regulatory requirements and technical specifications from complex documents.
Project characteristics analysis
- Equipment type analysis
- Consideration of target countries and desired commissioning date
- Consideration of applicable regulations, standards, technical specifications and references (national and international).
- Consideration of project-specific constraints (risk analyses, technical specifications)
7.2. Joint coefficients
For welded joints, the joint coefficient must be at most equal to the following value:
- •for equipment subject to destructive and non-destructive testing ensuring that all joints have no significant defects: 1,
- •for equipment subject to spot non-destructive testing: 0.85;
- •for equipment not subject to non-destructive testing other than visual inspection: 0.7.
If necessary, the type of stress and the mechanical and technological properties of the joint are also taken into account.
Automated compliance evaluation
Our system evaluates your project documents against regulatory requirements and technical specifications, identifying potential gaps.
Evaluation process
- Automated semantic analysis of project documents (Plans, reports, calculation notes, design notes, test program, end of manufacturing report, etc.).
- Detection of gaps with regulatory requirements and technical specifications.
- Access to proofs from documents that justify compliance.
You maintain control of decisions, with direct access to sources and justifications for each analysis.
Project technical document:
Calculation note – Steam generator envelope sizing
(Doc. Ref. ENG-NC-2456, Rev. B)
"The welded joints of the vessel will be inspected by sampling according to ISO 17635 standard. The joint coefficient used for sizing is 0.95."
| Ref. requirement | Law, Standard | Status |
|---|---|---|
| E-9 | ED-113 | Non-Compliant |
| D-4 | 89/655/CEE | Compliant |
| AD-1 | RCC-M 2024 | Processing |
AI-assisted recommendations
Get recommendations for concrete and prioritized corrective actions to comply with the regulations and technical specifications of the project.
Corrective action to a compliance gap
Priority action
Revise the calculation note – Steam generator envelope sizing (Doc. Ref. ENG-NC-2456, Rev. B) by applying a compliant joint coefficient ≤ 0.85 for this type of inspection.
Section III.M referenced in project documentation
Continuous monitoring
Stay up to date on regulatory changes with continuous monitoring and instant alerts.
Live regulatory updates
Directive Evolution Annex I, point 7.2
ISO 19443 Update
2hRCC-M Section III Revision
1dNew ESPN 2025 Requirement